How Many Pavers Per Square Metre? (Every Common Size)
22 November 2026
The number of pavers per square metre depends on the paver size and the joint gap. A standard 230 × 115 mm brick paver works out to about 36 per m² with 3 mm joints. A 400 × 400 mm paver is about 6 per m². Here's the full table, the formula, and how much extra to order.
Pavers per m² for common sizes
| Paver size | No joint | 3 mm joints |
|---|---|---|
| 230 × 115 mm | 37.8 | 36.4 |
| 200 × 100 mm | 50.0 | 47.8 |
| 300 × 300 mm | 11.1 | 10.9 |
| 400 × 400 mm | 6.25 | 6.2 |
| 600 × 300 mm | 5.6 | 5.5 |
| 600 × 600 mm | 2.8 | 2.75 |
These are the counts before you add anything for cuts. Many suppliers quote a per-m² figure for each product, and it's worth comparing yours with theirs.
The formula
Pavers per m² = 1 ÷ ((paver length + joint) × (paver width + joint)), with everything in metres.
For a 400 × 400 mm paver with a 3 mm joint: 1 ÷ (0.403 × 0.403) = 1 ÷ 0.1624 = 6.16 pavers per m².
Multiply that by the area. A 5 × 4 m patio is 20 m², so it needs 20 × 6.16 = 123 pavers before waste.
Small pavers are more sensitive to the joint. On a 230 × 115 mm paver, going from no joint to a 3 mm joint drops the count by about 4%. On a 600 × 600 mm paver it barely matters.
How much extra to order
- 5%: a plain rectangle laid square, with few cuts.
- 10%: most jobs. Some cuts around edges, a drain or a step.
- 15%: curves, herringbone or diagonal patterns, lots of edges, or a product that chips easily.
For the 20 m² patio at 10%, that's 123 × 1.1 = 136 pavers. Round up to full packs or pallets if the supplier sells them that way.
Keep a few spares from the same batch. Colours can shift between production runs, and a cracked paver in five years is much easier to fix with a matching one.
Sand and road base
Most pavers sit on a compacted road base with a screeded layer of bedding sand on top. Work out each layer as area × depth:
- Bedding sand at 30 mm: 20 m² × 0.03 = 0.6 m³, roughly 1 tonne.
- Road base at 100 mm: 20 m² × 0.1 = 2 m³, roughly 4 tonnes once compacted.
Road base depth depends on the load and the ground. Around 75 to 100 mm is common under paths and patios, with more under driveways or on soft clay. Follow the paver manufacturer's guide for your site, and ask your supplier for their tonnes-per-cubic-metre figure, since it varies by material.
Results are estimates. Check pack sizes and coverage with your supplier before you order.
Skip the maths. Put your own measurements in and get the answer in seconds, on your phone.
Open the paver calculator